Success Stories

Online Condition Monitoring and Protection System for booster pumps in Najma phase-2 pumping station

Dubai, UAE

General Information

Client: Dubai Electricity and Water Authority (DEWA) DEWA is the main provider of sustainable, efficient, and reliable power and water services and related smart solutions in the Emirate of Dubai, UAE.
Location: Dubai, UAE
Completion Date: December 2020
Contract Type: Design, Supply, Installation, Testing and Commissioning of Online Condition Monitoring and Protection System for 8 pumps.

Project Scope:

The Online Condition Monitoring and Protection System will detect machinery problems before a catastrophic failure can occur and provide a machinery shutdown signal to allow the site a safe shutdown of the equipment before a significant damage can occur. It will also provide the user an early warning of any potential problem to facilitate Predictive Maintenance (PdM) program and eliminate any of those unexpected machinery failures.

Process:

Water pumping station that supplies potable water to end users in the Emirate of Dubai. This project is a brownfield project where the CMS system was installed for existing running pumps and involved the drilling of the pump/motor casing to install the required sensors.

Our Solution:

Rockwell Automation Rockwell Automation Dynamix 144 Vibration Modules on ControlLogix processor, Flex RTD Modules, E-Monitor Vibration Analysis and Diagnostics software, Hansford vibration and temperature sensors, and Integration with Schneider SCADA System.

Related Projects