Project Scope:
The project involves the development of Umm Al Dalkh offshore field located 25 kilometers north-west of Abu Dhabi in the Arabian Gulf. The project, the Umm Al Dalkh early production scheme, aims to ramp up the field’s oil production capacity to 20,000 barrels per day by 2022 and sustain the production for three years. The project’s scope entails the drilling of three producer wells and two water injector wells at wellhead platform-15 (WHP-15). In addition, work scope involves the supply of treated water from the central processing facility.
Process:
Platform HVAC system ensures optimal air quality, temperature control, and ventilation in harsh offshore environments. Designed for durability, it maintains crew comfort and protects equipment by regulating humidity and removing contaminants. The system adheres to safety standards, supporting reliable operations in extreme conditions, including explosive atmospheres and corrosive environments.
Our Solution:
Siemens make Redundant S7-1500 Control System with Siemens 15” HMI System.