Project Scope:
ADNOC intends to Design and Construct crude oil storage facilities in Fujairah under M Project. The scope is to build three (3) storage facilities in Fujairah for storing Crude oil. As a strategy, three different grades of crude oil are intended to be stored in the storage facilities.
Murban (ADNOC Onshore), Das (ADNOC offshore) and Upper Zakum (ADNOC offshore) are the three different grades of crude oil intended to be stored each in separate Storage facility. The storage facility dedicated for Murban crude grade will be fed from the main existing ADCOP pipeline, while the other two storage facilities for Das and Upper Zakum crude grades will be fed via offshore crude oil Tankers. These requirements bring operational changes to the existing MOT facilities in terms of handling other grade crude and Offshore unloading procedures.
Process:
Chiller plant control system.
Our Solution:
Simplex ABB PLC enclosed in an Ex-e enclosure.