Abu Dhabi National Exhibition Company (ADNEC) District Cooling Plant

Abu Dhabi, UAE

General Information

Client: PAL Technology
As a subsidiary of PAL Group, PAL Technology is involved in District Cooling, Desalination Plants, Water Transmission lines, residential and commercial Construction, infrastructure works along with dredging and marine engineering and is a complete solution provider for the construction, utilities and infrastructure.
Location: Abu Dhabi, UAE
Completion Date: September 2014
Consultant: Architects Crang & Boake Inc.
Contract Type: Design, Supply, Installation Supervision, and Commissioning of the Integrated Instrumentation, PLC, and SCADA System for 11 Energy Transfer Stations.
Cooling Capacity: 20,000 RT
TES Tank: 20,000 Ton-Hr Thermal Energy Storage (TES) tank

Project Scope:

The project is providing a capacity of twenty thousand tons of refrigeration (25,000 TR) including TES tank, and serving the ADNEC district of hotels, office buildings, and conference centers.

The project includes the construction of the plant in its entirety, 20,000TR of series counter flow chillers and associated equipment, and a distribution network of over 2 Km (900mm pre-insulated pipes).

Process:

District Cooling provides chilled water from a centralized cooling station, through a network of pipes, for air-conditioning purposes.

Our Solution:

Redundant Allen-Bradley ControlLogix PLC System; Redundant Rockwell Automation FactoryTalk View Site Edition SCADA System, and Endress-Hauser Instrumentation system.