November 2014, Dubai, UAE.
Vista Automation sponsors the 6th Annual Middle East District Cooling Summit to be held in Qatar
Vista Automation sponsors the 6th Annual Middle East District Cooling Summit held at The Ritz-Carlton, Doha, State of Qatar between 10 -11 November 2014. During the summit; Vista Automation presented a technical paper on the optimal control of Thermal Energy Storage Tanks in District Cooling Applications. For detailed agenda click here.
To Download photos form the event click here
July 2014, Dubai, UAE.
Vista Automation is Declared as “Recognized” System Integrators for Rockwell Automation
In recognition to Vista Automation’s proven competency with Rockwell Automation products and supportive relationship; Vista Automation is now declared to be part of the elite “Recognized ” System Integrators club for Rockwell Automation.
June 2014, Dubai, UAE.
Vista Automation Successfully Completed the Stage 2 Audit for the Implementation of Quality Management System as Per ISO9001:2008 Standards and Becomes an ISO Certified Company
As part of the ISO Certification Procedure; TUV Nord (ISO Authorized Auditors and Certification Body) has Completed the Stage 2 Audit of Vista Automation Quality Management System as Per ISO9001:2008 Standards and Declared the Audit to be Successful and cleared the way for Issuing the ISO9001:2008 Certification to Vista Automation.
April 2014, Irbil, Iraq.
Vista Automation Wins its First Contract in Iraq form Bin Khalid Group for the Control and Instrumentation System of Khor Al-Zubair Power Plant Turbine Inlet Air Cooling (TIAC) System
Being the leading System Integrators for Turbine Inlet Air Cooling Application in the region; Vista Automation was awarded its first contract in Iraq form the Irbil-based Bin Khalid Group. The awarded contract is for the Engineering, Supply, Installation Supervision, and Commissioning of the Controls and Instrumentation Systems for two TIAC systems for Khor Al-Zubair Power Plant. The Project is expected to be delivered by August 2014 and commissioned by October 2014.
April 2014, Dubai, UAE.
Vista Automation Successfully Completed the Stage 1 Audit for the Implementation of Quality Management System as Per ISO9001:2008 Standards
As part of the ISO Certification Procedure; TUV Nord (ISO Authorized Auditors and Certification Body) has Completed the Stage 1 Audit of Vista Automation Quality Management System as Per ISO9001:2008 Standards and Declared the Audit to be Successful and cleared the way for Stage 2 Audit (Final Audit before Certification).
January 2014, Doha, Qatar.
Vista Automation Wins its First Contract in Qatar form QAFCo to Upgrade the Control System of the HVAC system at Hall D
Vista Automation was awarded its first contract in the Qatari market form Qatar Petroleum Subsidiary Qatar Fertilizer Company (QAFCO). The awarded contract is for the Engineering, Supply, Installation, and Commissioning of the Upgrade of the HVAC Control System at Hall D. The Project is expected to be delivered by March 2014 and commissioned as per the plant shutdown schedule in 2014.