Project Highlights
Zayed University District Cooling Plants 1&2
General
Client:
Zayed University
Zayed University is the newest of the three government-sponsored higher education institutions in the United Arab Emirates. Achieving accreditation by the Middle States Commission on Higher Education in the USA it became the first federal university in the UAE to be internationally accredited.
Location:
Abu Dhabi, United Arab Emirates
Completion Date:
October 2011
Consultant:
Zayed University
Contract Type:
Design, Supply, Installation Supervision, and Commissioning of the Integrated Instrumentation, PLC, and SCADA System.
Cooling Capacity:
2×10,000TR
Project Scope:
The project includes the design, fabrication and installation of two modular chiller plants for Zayed University’s district cooling system, which provides air conditioning for all of the University’s buildings and the piping network.
The system features a parallel chiller arrangement. The pumping arrangement is primary secondary
Process:
District Cooling provides chilled water from a centralized cooling station, through a network of pipes, for air-conditioning purposes.
Our Solution:
Allen-Bradley CompactLogix PLC System; Redundant Rockwell Automation FactoryTalk View Site Edition SCADA System, and Endress-Hauser Instrumentation system