Emirates Aluminum Phase II – Controls, Instrumentation and SCADA POV Support
General
Client:
Emirates Aluminum (EMAL)
Emirates Aluminum is an aluminum conglomerate with interests in bauxite/alumina and primary aluminum smelting.
Location:
Abu Dhabi, UAE
Completion Date:
November 2014
Consultant:
SNC Lavalin
Contract Type:
Integration of all Sub-systems Supplied by OEM Plant-wide into a 3 Central SCADA Systems.
Project Scope:
EMAL’s Phase II boosts the company’s aluminum production from 800,000 ton to 1.3 million metric ton per year. With phase II beginning production, EMAL is now the largest single site production capacity in the world. The site currently includes a 2100 MW power plant, which will increase to 3000 MW, a carbon power plant and a flexible cast house with a capacity to produce a variety of products.
Vista Automation supported the integration and Pre Operational Verifications activities of Instrumentation, Controls, SCADA systems along with the End User, EPCM, and vendors of equipment with more than 7 Engineers dedicated full time for this project for more than 9 month
Our Solution:
Allen-Bradley PLC Systems; and Rockwell Automation FactoryTalk View Site Edition SCADA System.