General

Client:
EMAAR

EMAAR Properties is one of the largest real estate developers in the UAE and is known for various large-scale projects such as developing Burj Khalifa, the tallest building in the world.

Location:
Dubai, UAE

Completion Date:
December 2018

Consultant:
Allied Consultants Co.

Contract Type:
Design, Supply, Installation Supervision, and Commissioning of the Integrated Instrumentation, PLC, and SCADA System.

Project Scope:
Dubai Creek Harbour is the future of Dubai, it is a large, master-planned water-front development. The centerpiece of the development will be the new cable-tied Dubai Creek Tower which is expected to be taller than the Burj Khalifa.

The Dubai Creek Harbour District Cooling Plant It has 48,000TR, six sets of chiller modules with total capacity of 38,400 TR along with two TES tanks of 9,600TR to the plant capacity.

Process:
District Cooling provides chilled water from a centralized cooling station, through a network of pipes, for air-conditioning purposes

Our Solution:
Redundant Siemens S7400H PLC System; Redundant Siemens WinCC Server-Client, Historian with Reporting, and Siemens and Endress-Hauser Instrumentation system.