contract to Design, Supply, Supervision of Installation, and Commissioning for the Instrumentation, Controls, and SCADA System for Madina Hajj City
Vista is awarded the contract to Design, Supply, Supervision of Installation, and Commissioning for the Instrumentation, Controls, and SCADA System for Madina Hajj City Infrastructure and Utilities Project. The 4.1-million USD contract scope of work covers the instrumentation and control system for the city infrastructure including:
- Two District Cooling Plants with a capacity of 100,000 Tones each
- 103 Energy Transfer Stations
- Tunnel Ventilation System
- Irrigation Pumping Stations
- Grey Water Pumping Stations
- Water Features Pumping Stations
The Project also will provide a dedicated redundant PLC system and a redundant client-server SCADA system for each District Cooling plant with redundant Historian for data logging and reporting of process critical parameters; in addition to Central redundant client-server SCADA system for the whole city utilities and infrastructure with central redundant database Historian and reporting.
The Controls and SCADA solution is based on latest technologies form Rockwell Automation hardware and software with Endress+Houser instrumentation.
The project is scheduled to be delivered to site by September 2016 and commissioned by March 2017.